top of page

Mawson Lakes School Shared-Use Bridge

Shared-Use Bridge at Mawson Lakes Primary School

Construction of a pedestrian bridge across Dry Creek at Mawson Lakes.


Job Notes:

  • 2.4m wide steel and composite decking structure

  • 62m long, spanning over two in-situ concrete piers

  • Constructed with minimal disturbance to the natural creek environment below

  • Designed to connect shared paths and accommodate cyclists, while being fully accessible and compliant with Universal Design and CPTED principles

Project Gallery

©2024 BY CIVIL TECH PTY LTD

BLD 186315

bottom of page