top of page
Ash Grove Pedestrian Footbridge, Rostrevor
DDA Pedestrian Footbridge in Ash Grove, Rostrevor
The works for this project mainly included:
Removal of existing bridge
the design and construction of the bridge (DDA)
the design and construction of ramp at the southern end with Tri 1 decking with Balustrade
relocation of existing irrigation system
reshaping of footpath at the northern end and
relocation of two signage
Location: Horwood Avenue Reserve and Fourth Creek Nature Play Trail
Project Gallery
bottom of page