Stage 1 – Lansdowne Terrace (Linear Park to Vale St)
The main components of around 400m of 1200 and 1050 RCP at depths of up to 3.9m. Works required construction of both large insitu and precast junction boxes up to 4.0m deep, as well as cross connections, side entry pits and grated inlet pits. Finishing works included new kerbing where required, 3 fully lined rain gardens, and reseal of the road.