Apr 20, 2023
Victor Harbor Oval Carpark Construction Works Completed!
This works included in this are, but not limited to: Provision of traffic management to ensure safe access for the general community....
Sep 23, 2022
New Car Park for the Blackwood Community!
We have just finished up a job in Blackwood, a new car park for the community! It includes 2 DDA car parks, pram access and 37 car park...
Jan 14, 2022
Cowell Boat Ramp Upgrade
This project involved: Site Establishment, Preliminaries, New Boat Ramp, Supply and Installation of Boat Launching Pontoons, Installation...
Jan 14, 2022
Mistletoe Torrens Linear Path Upgrade
The scope of works included the rehabilitation and renewal of infrastructure assets associated with Park 11, east of Albert Bridge with...
Jul 18, 2019
McHarg Creek Road Culvert Stormwater Upgrade
The scope of works Installation of 13m of new 1.5x1.8m box culvert across McHargs Creek Rd. Works involved demolition of old stone...
May 25, 2019
Lansdowne Terrace Stormwater and Road Upgrade
In 2019, Civil Tech completed a major drainage upgrade for Town of Walkerville, involving a new 1.3km trunk main adjacent the River...
Aug 10, 2018
Cleland Gully Road, Tooperang Stormwater Upgrade
The scope of work involved replacement of a failed 900RCP with new 1200 RCP at invert depth of up to 4m. Challenges included soft sand...
Jul 20, 2018
Construction of Gabion, Verge and Stormwater Works
Civil Tech Pty Ltd recently completed works at Woodgate Hill Rd, Kyeema. Heavy rain had resulted in a substantial landslip on a steep...
Apr 27, 2018
Stormwater Culvert Repairs
The scope of works included repairs damaged sections of roads, culverts, and bridges in various locations including infrastructure...
Apr 23, 2018
Stormwater Culvert Repairs
Completed in 2018, the scope of works covered design and construction of repairs and the replacement of existing culverts damaged by...
Oct 27, 2017
Goolwa Terrace Traffic Management and Streetscape Upgrade
The Cadell Street Upgrade is a road intersection reconstruction, public carpark construction, and streetscape beautification project. The...
Jul 13, 2017
Drainage Channel Upgrade
Drainage upgrade in Yandra Terraace, Hayborough including earthworks, installation of drainage pipes, pits, box culverts, GPT, SA Water...
Jun 30, 2017
Streetscape Upgrade - Prospect Road - Way Street to Grand Junction Road, Kilburn
The scope of works consisted of the following key elements but not limited to site establishment, demolition, paving, landscaping,...
Mar 22, 2017
Tainmuntilla River Bank Stability - River Torrens
During the winter months, construction of 200m of bank stabilisation on the edge of the River Torrens at Hackney, including reinstatement...
Jan 29, 2014
Stormwater Drainage Construction Water Saving Urban Design (WSUD)
Stormwater Drainage Construction Water Saving Urban Design (WSUD) – Batchelor Reserve, Norseman Avenue, Westbourne Park.
Mar 27, 2013
Mount Compass Shops, Carparking and Streetscape Project
Civil Tech Pty Ltd was recruited by the Alexandrina Council in order to create a beautiful Streetscape in Mount Compass. This project...
Feb 15, 2010
Grange Jetty Precinct Works
Civil Tech Pty Ltd was in charge of upgrading the Grange Jetty Precinct. The job required demolition works, major civil works including...
Let’s Work Together
Address: 231 Fullarton Rd, Eastwood SA 5063, Australia
Email: admin@civil-tech.com.au
Telephone: (08) 8271 7400