VALO Adelaide 500 - That's a Wrap!
We're so proud to have worked with iEDM and the VALO Adelaide500 again this year, helping with track maintenance and civil works.
Jan 14, 2022
Milang Foreshore Restoration
The project involved a major upgrade of the Milang foreshore, including new paths, shelter structures and a bespoke bird hide, to provide...
May 10, 2018
Adelaide 500 Track and Civil Works
The scope of works includes site preliminaries and establishment; erection and dismantle of temporary structures including overpass...
Apr 23, 2018
Stormwater Culvert Repairs
Completed in 2018, the scope of works covered design and construction of repairs and the replacement of existing culverts damaged by...
Feb 12, 2018
Milang Foreshore Restoration
The project involved a major upgrade of the Milang foreshore, including new paths, shelter structures and a bespoke bird hide, to provide...
Mar 22, 2017
Tainmuntilla River Bank Stability - River Torrens
During the winter months, construction of 200m of bank stabilisation on the edge of the River Torrens at Hackney, including reinstatement...
Jan 29, 2014
Stormwater Drainage Construction Water Saving Urban Design (WSUD)
Stormwater Drainage Construction Water Saving Urban Design (WSUD) – Batchelor Reserve, Norseman Avenue, Westbourne Park.