top of page

BLOG


Pedestrian Footbridge Ready for Use!
We have just finished up our work on the new Pedestrian Footbridge in Ash Grove, Rostrevor.
Sep 23, 2022


New Car Park for the Blackwood Community!
We have just finished up a job in Blackwood, a new car park for the community! It includes 2 DDA car parks, pram access and 37 car park...
Sep 23, 2022


Cowell Boat Ramp Upgrade
This project involved: Site Establishment, Preliminaries, New Boat Ramp, Supply and Installation of Boat Launching Pontoons, Installation...
Jan 14, 2022


Mistletoe Torrens Linear Path Upgrade
The scope of works included the rehabilitation and renewal of infrastructure assets associated with Park 11, east of Albert Bridge with...
Jan 14, 2022


Emu Bay Boat Ramp Upgrade
Construction of a 4.0m wide ramp and one (1) 8.0m wide ramp with two fendered landing jetties on the exterior of the ramps, a new sealed...
Jan 14, 2022


Stormwater Culvert Repairs
The scope of works included repairs damaged sections of roads, culverts, and bridges in various locations including infrastructure...
Apr 27, 2018

Stormwater Culvert Repairs
Completed in 2018, the scope of works covered design and construction of repairs and the replacement of existing culverts damaged by...
Apr 23, 2018


Goolwa Terrace Traffic Management and Streetscape Upgrade
The Cadell Street Upgrade is a road intersection reconstruction, public carpark construction, and streetscape beautification project. The...
Oct 27, 2017

Drainage Channel Upgrade
Drainage upgrade in Yandra Terraace, Hayborough including earthworks, installation of drainage pipes, pits, box culverts, GPT, SA Water...
Jul 13, 2017


Tainmuntilla River Bank Stability - River Torrens
During the winter months, construction of 200m of bank stabilisation on the edge of the River Torrens at Hackney, including reinstatement...
Mar 22, 2017

Agnes Water Desalination Plant
Design/Construct Pump Well and Inlet and Outlet Structure for Desalination Plant. Excavation 12m deep shaft in concrete works for intake...
Sep 26, 2014

Stormwater Drainage Construction Water Saving Urban Design (WSUD)
Stormwater Drainage Construction Water Saving Urban Design (WSUD) – Batchelor Reserve, Norseman Avenue, Westbourne Park.
Jan 29, 2014

Mount Compass Shops, Carparking and Streetscape Project
Civil Tech Pty Ltd was recruited by the Alexandrina Council in order to create a beautiful Streetscape in Mount Compass. This project...
Mar 27, 2013

Grange Jetty Precinct Works
Civil Tech Pty Ltd was in charge of upgrading the Grange Jetty Precinct. The job required demolition works, major civil works including...
Feb 15, 2010

Swan Reach Pumping Station Design/Construct
Design and Construct Low-Lift Pump Station - Swan Reach Pump Station.
Apr 30, 2009
Let’s Work Together
Address: 231 Fullarton Rd, Eastwood SA 5063, Australia
Email: admin@civil-tech.com.au
Telephone: (08) 8271 7400
bottom of page