Sep 6, 2018
Victor Turntable Carpark and Landscaping
The scope of works was for the construction of a new carpark, retaining wall and associated works.
Jul 31, 2018
Lansdowne Terrace Stormwater and Road Upgrade
Stage 1 – Lansdowne Terrace (Linear Park to Vale St) The main components of around 400m of 1200 and 1050 RCP at depths of up to 3.9m....
Jul 20, 2018
Construction of Gabion, Verge and Stormwater Works
Civil Tech Pty Ltd recently completed works at Woodgate Hill Rd, Kyeema. Heavy rain had resulted in a substantial landslip on a steep...
May 16, 2018
Construction of Memorial Park Bridge
The scope of work included setting out the works from established bench marks and boundaries; demolition of the existing bridge,...
Apr 27, 2018
Stormwater Culvert Repairs
The scope of works included repairs damaged sections of roads, culverts, and bridges in various locations including infrastructure...
Feb 12, 2018
Milang Foreshore Restoration
The project involved a major upgrade of the Milang foreshore, including new paths, shelter structures and a bespoke bird hide, to provide...
Jan 31, 2018
Gilberton Swing Bridge
Working in partnership with the Council, heritage advisor and engineering consultants OPUS, Civil Tech Pty Ltd undertook the replacement...
Nov 30, 2017
Mawson Lakes Footbridges
The scope of works for the Carnegie and Victoria Drive Footbridges comprised of the design, supply and installation of two clear span...
Oct 27, 2017
Goolwa Terrace Traffic Management and Streetscape Upgrade
The Cadell Street Upgrade is a road intersection reconstruction, public carpark construction, and streetscape beautification project. The...
Sep 14, 2017
Redevelopment of the Port Hughes Boat Ramp
Civil Tech Pty Ltd redevelop the very visually pleasing Port Hughes Boat Ramp. The scope of works included a new launching area, rock...
Jul 13, 2017
Drainage Channel Upgrade
Drainage upgrade in Yandra Terraace, Hayborough including earthworks, installation of drainage pipes, pits, box culverts, GPT, SA Water...
Jun 30, 2017
Streetscape Upgrade - Prospect Road - Way Street to Grand Junction Road, Kilburn
The scope of works consisted of the following key elements but not limited to site establishment, demolition, paving, landscaping,...
Mar 22, 2017
Tainmuntilla River Bank Stability - River Torrens
During the winter months, construction of 200m of bank stabilisation on the edge of the River Torrens at Hackney, including reinstatement...
Dec 18, 2015
Christies Creek Morphett Vale Linear Path Upgrade
Civil Tech Pty Ltd undertook earthworks, boardwalk construction, and concrete finishes and landscape components to complete the Linear...
Jun 17, 2015
Grange Lakes Shared Use Path Boardwalk Construction
Civil Tech Pty Ltd was responsible for the supply, fabrication and construction of a boardwalk shared use path structure along the...
Sep 26, 2014
Agnes Water Desalination Plant
Design/Construct Pump Well and Inlet and Outlet Structure for Desalination Plant. Excavation 12m deep shaft in concrete works for intake...
Jan 29, 2014
Stormwater Drainage Construction Water Saving Urban Design (WSUD)
Stormwater Drainage Construction Water Saving Urban Design (WSUD) – Batchelor Reserve, Norseman Avenue, Westbourne Park.
Nov 20, 2009
River Torrens Seaview Underpass
Civil Tech Pty Ltd was responsible for the construction of a dual-use pedestrian/bicycle path and walkway along the northern concrete...
Apr 30, 2009
Swan Reach Pumping Station Design/Construct
Design and Construct Low-Lift Pump Station - Swan Reach Pump Station.