Sep 13, 2019
Victoria Square - Eastern Footpath Upgrade
Replacement of footpaths and kerbing along eastern side of Victoria Square. Works involved demolition and replacement of 180m of heavy...
Jul 18, 2019
McHarg Creek Road Culvert Stormwater Upgrade
The scope of works Installation of 13m of new 1.5x1.8m box culvert across McHargs Creek Rd. Works involved demolition of old stone...
Jul 18, 2019
New Intersection Access, Totness
Construction of Intersection Access into new commercial development located at 22 Mt Barker Road, Totness including Earthworks,...
Jul 18, 2019
Kays Road McLaren Vale Retaining Wall
Completed in just 7 days, the works involved construction of a 3.5m high mass block retaining wall, adjacent a rural road at McLaren...
Jul 18, 2019
Copper Coast Highway - Kadina
Copper Coast Highway diversion to create new extension of Kadina CBA. Work done on DPTI road to DPTI standards but financed by Copper...
Jul 12, 2019
McHarg Creek Road - Culvert Upgrade
Installation of 13m of new 1.5 x 1.8m box culvert across McHargs Creek Rd, at depths of up to 3.3m. Works involved progressive demolition...
Jul 9, 2019
Middleton Footbridge Construction Works
After a major storm, an existing pedestrian bridge was lost and adjacent banks were severely eroded. Civil Tech installed more than 70m3...
May 25, 2019
Lansdowne Terrace Stormwater and Road Upgrade
In 2019, Civil Tech completed a major drainage upgrade for Town of Walkerville, involving a new 1.3km trunk main adjacent the River...
Oct 28, 2018
Northern Connector Pipeline
The scope of works includes procure pipe and complete construction works to upgrade the existing WRSV recycled water pipeline in advance...
Sep 6, 2018
Victor Turntable Carpark and Landscaping
The scope of works was for the construction of a new carpark, retaining wall and associated works.
Sep 3, 2018
High Street Carpark, Strathalbyn
New carpark re-construction and line-marking.
Aug 10, 2018
Cleland Gully Road, Tooperang Stormwater Upgrade
The scope of work involved replacement of a failed 900RCP with new 1200 RCP at invert depth of up to 4m. Challenges included soft sand...
Aug 10, 2018
Storm Damage Repairs, Strathalbyn
The scope of work included repairs to scour damage at an existing floodway at Strathalbyn. A 3m baboon wall was installed, along with...
Jul 31, 2018
Lansdowne Terrace Stormwater and Road Upgrade
Stage 1 – Lansdowne Terrace (Linear Park to Vale St) The main components of around 400m of 1200 and 1050 RCP at depths of up to 3.9m....
Jul 20, 2018
Construction of Gabion, Verge and Stormwater Works
Civil Tech Pty Ltd recently completed works at Woodgate Hill Rd, Kyeema. Heavy rain had resulted in a substantial landslip on a steep...
May 24, 2018
Park Drive Lighting Upgrade
Installation of 4 new DPTI standard street lights along Kangarilla Rd, near Park Drive, McLaren Vale. New conduits were installed with a...
May 16, 2018
Construction of Memorial Park Bridge
The scope of work included setting out the works from established bench marks and boundaries; demolition of the existing bridge,...
May 10, 2018
Adelaide 500 Track and Civil Works
The scope of works includes site preliminaries and establishment; erection and dismantle of temporary structures including overpass...
Apr 27, 2018
Stormwater Culvert Repairs
The scope of works included repairs damaged sections of roads, culverts, and bridges in various locations including infrastructure...
Apr 23, 2018
Stormwater Culvert Repairs
Completed in 2018, the scope of works covered design and construction of repairs and the replacement of existing culverts damaged by...